Wednesday, October 29, 2014

BW tunnel entry / outline visible

The tunnel and entry/exit from Lougheed Hwy into Brentwood Town Centre's future underground parking lot appears to be marked out when seen from when viewed from the Sears rooftop parking.  The parts not yet dug up will most likely be the locations of future commercial spaces.







7 comments:

  1. Excited to see how this goes shortly. Heard that tower one will be available by end 2015, is this possible ?

    ReplyDelete
    Replies
    1. I believe that the earliest occupancy will be in 2017 for the residential towers.

      Delete
  2. Replies
    1. 2016 at the earliest for some of the retail fronting the new street to be paved onsite.

      Delete
    2. So we are talking about 2016-2018 for the tower one and tower two to be completed. This is so-called phase one ?
      Then the area behind is phase two ?

      Delete
  3. Then the old Brentwood will be vanished in phase two ?

    ReplyDelete
  4. The following post (link), although not accurate in terms of the start date at that time, shows a map of the phases. The original Mall will not be entirely torn down.

    http://brentwoodstation.blogspot.ca/2012/01/entertainment-plaza-to-begin.html